| Body color | Green, orange, Purple, Red |
|---|---|
| Pack of | 1 Pencil, 10 pencils, 100 Pencils, 50 Pencils |
| Line widths | 0.7 mm |
| Brand | FLAIR |
| Colour | Multicolor |
| Cover Material | paper |
| Material | Plastic |
| Manufacturer | Flair Writing Industries Ltd. |
| Country of Origin | India |
| Item Dimensions LxWxH | 15 x 5 x 2 Centimeters |
| Net Quantity | 10.0 count |
| Included Components | Lead |
| Generic Name | Mechanical pencils |
Flair Tuff 0.7mm Mechanical Pencil
Sale!
Type: Mechanical pencils
₹9.00 – ₹900.00
Product Information
- Package Includes – Flair Tuff Mechanical Pencil Blister Pack, 15 Pcs , 0.7 mm Lead , Includes 2 Pcs Xtra Long Lead Tubes Each Pack, Retractable Mechanism.
- Light-weight mechanical pencil with a rubberised grip
- Triangular barrel for relaxed drawing
- Built-in eraser under the push-button cap for rapid corrections
SKU: VPSSMP590
Categories: Mechanical Pencils, School Supplies
Tags: 0.7mm Lead Pencils, 0.7mm Mechanical Pencils, 0.7mm Pen Pencils, Graphite Pencils, Lead Pencils, Mechanical Pencils, Pen Pencils
Brand: Flair
Be the first to review “Flair Tuff 0.7mm Mechanical Pencil” Cancel reply
Ball Pens
Calculators
Carbon Papers
Chalks & Holders
Clips & Pins
Correction Pens & Tapes
Erasers
Exam Pads
Fountain Pens
Glitter Pens
Highlighters
Ink Bottles
Mechanical Pencils
Mini Drafters
Note Books
Office Supplies
Pencils
Punching Machines
School Supplies
Sharpners
Staplers
Wax Crayons
Writing Supplies 

Reviews
There are no reviews yet.