| Body color | Green, orange, Purple, Red |
|---|---|
| Pack of | 1 Pencil, 10 pencils, 100 Pencils, 50 Pencils |
| Line widths | 0.7 mm |
| Brand | FLAIR |
| Colour | Multicolor |
| Cover Material | paper |
| Material | Plastic |
| Manufacturer | Flair Writing Industries Ltd. |
| Country of Origin | India |
| Item Dimensions LxWxH | 15 x 5 x 2 Centimeters |
| Net Quantity | 10.0 count |
| Included Components | Lead |
| Generic Name | Mechanical pencils |
Flair Tuff 0.7mm Mechanical Pencil
Sale!
Type: Mechanical pencils
₹9.00 – ₹900.00Price range: ₹9.00 through ₹900.00
Product Information
- Package Includes – Flair Tuff Mechanical Pencil Blister Pack, 15 Pcs , 0.7 mm Lead , Includes 2 Pcs Xtra Long Lead Tubes Each Pack, Retractable Mechanism.
- Light-weight mechanical pencil with a rubberised grip
- Triangular barrel for relaxed drawing
- Built-in eraser under the push-button cap for rapid corrections
SKU: VPSSMP590
Categories: Mechanical Pencils, School Supplies
Tags: 0.7mm Lead Pencils, 0.7mm Mechanical Pencils, 0.7mm Pen Pencils, Graphite Pencils, Lead Pencils, Mechanical Pencils, Pen Pencils
Brand: Flair
Be the first to review “Flair Tuff 0.7mm Mechanical Pencil” Cancel reply
Related products
-
Apsara Mickey Mouse And Friends Pencil
0 out of 5 0₹8.80 – ₹882.00Price range: ₹8.80 through ₹882.00 -
DOMS Drawing Pencil Set of 6
0 out of 5 0₹180.00Original price was: ₹180.00.₹162.00Current price is: ₹162.00. -


Reviews
There are no reviews yet.