Body color | Green, orange, Purple, Red |
---|---|
Pack of | 1 Pencil, 10 pencils, 100 Pencils, 50 Pencils |
Line widths | 0.7 mm |
Brand | FLAIR |
Colour | Multicolor |
Cover Material | paper |
Material | Plastic |
Manufacturer | Flair Writing Industries Ltd. |
Country of Origin | India |
Item Dimensions LxWxH | 15 x 5 x 2 Centimeters |
Net Quantity | 10.0 count |
Included Components | Lead |
Generic Name | Mechanical pencils |
Flair Tuff 0.7mm Mechanical Pencil
Sale!
Type: Mechanical pencils
₹9.00 – ₹900.00
Product Information
- Package Includes – Flair Tuff Mechanical Pencil Blister Pack, 15 Pcs , 0.7 mm Lead , Includes 2 Pcs Xtra Long Lead Tubes Each Pack, Retractable Mechanism.
- Light-weight mechanical pencil with a rubberised grip
- Triangular barrel for relaxed drawing
- Built-in eraser under the push-button cap for rapid corrections
SKU: VPSSMP590
Categories: Mechanical Pencils, School Supplies
Tags: 0.7mm Lead Pencils, 0.7mm Mechanical Pencils, 0.7mm Pen Pencils, Graphite Pencils, Lead Pencils, Mechanical Pencils, Pen Pencils
Brand: Flair
Be the first to review “Flair Tuff 0.7mm Mechanical Pencil” Cancel reply
Reviews
There are no reviews yet.