0 Cart

No products in the cart.

Member Discount Days! Save 25% Each Tuesday

Flair Tuff 0.7mm Mechanical Pencil

Sale!
Type: Mechanical pencils

Price range: ₹9.00 through ₹900.00

Product Information

  • Package Includes – Flair Tuff Mechanical Pencil Blister Pack, 15 Pcs , 0.7 mm Lead , Includes 2 Pcs Xtra Long Lead Tubes Each Pack, Retractable Mechanism.
  • Light-weight mechanical pencil with a rubberised grip
  • Triangular barrel for relaxed drawing
  • Built-in eraser under the push-button cap for rapid corrections
Body color

Green, orange, Purple, Red

Pack of

1 Pencil, 10 pencils, 100 Pencils, 50 Pencils

Line widths

0.7 mm

Brand ‎

FLAIR

Colour

‎Multicolor

Cover Material

paper

Material ‎

Plastic

Manufacturer

‎‎Flair Writing Industries Ltd.

Country of Origin

‎India

Item Dimensions LxWxH

15 x 5 x 2 Centimeters

Net Quantity

10.0 count

Included Components

Lead

Generic Name

Mechanical pencils

Reviews

There are no reviews yet.

Be the first to review “Flair Tuff 0.7mm Mechanical Pencil”

Your email address will not be published. Required fields are marked *

Flair Tuff 0.7mm Mechanical Pencil
Flair Tuff 0.7mm Mechanical Pencil
Price range: ₹9.00 through ₹900.00
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare